Small
For first workshop planning or lower daily raw nut input.
Prepare workers, power, steam, and target stages.
Line planning option
Review the machine sequence, capacity discussion points, utility needs, and factory preparation details for this line type.
This line option is for a small workshop or first mechanized line. It helps you compare the machine sequence before asking for a formal quotation.
Commonly discussed for lower daily input and staged automation. Final capacity depends on the machines selected.
Share daily raw nut input, factory status, target automation level, worker count, available space, power condition, steam plan, air compressor status, and the stages you want to automate first.
For first workshop planning or lower daily raw nut input.
Prepare workers, power, steam, and target stages.
For semi-automatic line planning with staged expansion.
Prepare daily capacity, factory space, and key bottlenecks.
For higher automation and line-based configuration.
Prepare utilities, process sequence, and operating hours.
For mixed stages or equipment replacement projects.
Final capacity depends on confirmed line configuration.
This guide explains common cashew shell and kernel separation problems, from kernel breakage to capacity mismatches. Learn how...
Poor raw cashew grading causes problems that ripple through shelling, peeling, and final inspection. Learn how sizing mistakes,...
Learn what to check during final cashew kernel picking with a practical quality inspection checklist. Covers visual defects,...
Labor saving estimate
Enter only the key numbers. Use this as a rough labor-saving check before you send requirements.
Enter the main numbers, then calculate a rough labor saving and payback estimate.
Planning estimate only. Final ROI depends on machine configuration, utilities, operating hours, logistics, and the final order scope.